Two serious ruptures of the inflatable dam led the operator to seek a more robust solution to maintain the same fill level of the reservoir without reducing its discharge capacity.
Straight-crested fusegates were selected as they are specially designed to function effectively under strong headwaters.
They were built on-site with cast reinforced concrete and weigh over 120 tons apiece.