|
The fusegate system was incorporated as part of the construction phase of the project.
The initial design called for three 14 m-wide free-sill spillways; thanks to the use of fusegates, only two such spillways were required (each 15.6 m wide).
Their wells were replaced by pipes embedded in the concrete, leading to water-intake openings.
Project design allows for the future replacement of the 1.1 m-high fusegates by 2.6 m-high modules with no change to the maximum water levels.