Kamuzu Dams I and II were built to respond to increasing water demands from the town of Lilongwe.
The owner decided to raise the water level of Kamuzu II by 5 m.
Hydroplus completed the design, construction and installation of 14 concrete fusegates in less than 1 year.
This system made it possible to double the reservoir storage capacity from 8.9 million m³ to 19.8 million m³.