|
The fusegates designed for this project were built exclusively using local manpower.
The bases of the fusegates are in reinforced concrete; the superstructure is in masonry.
The fusegates ensure the same storage capacity without modifying the dam.
Thanks to the fusegate system’s quick installation, a whole year of operation could be saved.