|
A flood reassessment revealed that the spillway was incapable of discharging the revised design flood.
In light of the environmental, maintenance and cost factors, the dam owner decided to lower the spillway crest, while maintaining the original water level by installing fusegates.
| | | United States | Date of completion 2006 | Performance Increase spillway discharge capacity | Fusegate type Straight | Number 6 | Height 2.74 m | Width 7.32 m |
|