|
Fusegates were installed on the sill, which was lowered and rebuilt 40 cm below its initial level.
The fusegates, which were installed in just ten days, provide a 0.85 m increase in the water storage level.
| | | France | Date of completion 1997 | Performance Increase storage and discharge spillway capacity | Fusegate type Labyrinth | Number 8 | Height 1.25 m | Width 1.96 m |
|